The Gates Hotel South Beach
A water-valve installation lowered utility bills with minimal disruption to hotel operations and guest comfort.
average water-bill savings reported by the hotel
The property
The hotel installed a Wave water-valve solution in October 2018. A later engineering-director letter describes its experience with costs, water use and operation.
Project team
A specialist water-valve installation reduced water use at the hotel. Its engineering director documented the operating experience and savings.
What changed
The letter describes a valve installation taking under 30 minutes with limited disruption. It reports continued satisfactory water pressure and no problems with water-using equipment.
Project record
Installed in October 2018; the hotel’s engineering-director reference is dated August 10, 2020.
Results
The hotel reports average water-bill savings of 20.7% and an average 8.99% reduction in water use. Its engineering director also describes continued strong water pressure, satisfied guests and a product that paid for itself.